Front End Engineering Design of Offshore Pipeline for the East Mediterranean Project (EastMed)

IGI-Poseidon SA

The Contract concerns the provision of Front end engineering design services related to the offshore pipeline sections of the Eastern Mediterranean pipeline project (EastMed) which will allow to transport natural gas from South Eastern Mediterranean basin to Western Greece (Thesprotia Prefecture).
The EastMed project has an initial nominal gas capacity transported to Western Greece of approx. 10 Bcm per year with possible upgrade up to 20 Bcm per year.
The main technical characteristics in relation to the offshore pipeline FEED are the following:
— approx.1340 km high pressure natural gas pipeline
— offshore pipeline divided in following sections:
— (1) from gas sources to Cyprus (approx.. 170 km with 2320 m max water depth)
— (2) from Cyprus to East Crete (approx. 740 km with 3000 m max water depth)
— (3) from Crete to South Peloponnese (approx.. 430 km with 1580 max water depth)
— (4) crossing Gulf of Patras (approx.. 18 km with 110 m max water depth)
The indicative pipeline diameters referred to a capacity of 10 BSmc per year are the following (subject to assessment and confirmation):
— section (1): 24”
— section (2): 26”
— section (3): 26”
— section (4): 42"

Προθεσμία
Η προθεσμία παραλαβής των προσφορών ήταν 2018-07-30. Η προμήθεια δημοσιεύθηκε στις 2018-06-28.

Ποιος

Τι

Πού

Ιστορικό προμηθειών
Ημερομηνία Έγγραφο
2018-06-28 Προκήρυξη σύμβασης