Front End Engineering Design of Onshore Pipeline for the East Mediterranean Project (EastMed Pipeline)

IGI-Poseidon SA

The contract concerns the provision of Front End Engineering Design services related to the onshore pipeline section of the East Mediterranean Project (EastMed).
The EastMed Project has the following characteristics in relation to the onshore pipeline FEED:
— Approx. 550 km high pressure natural gas pipeline between a landfall in the southern Peloponnese of Greece to Thesprotia on the NW coast of Greece,
— Indicative pipeline diameter in the range 42”-48” (subject to assessment and confirmation),
— the FEED services include definition of the pipeline route, alignment sheets, design deliverables to a level to enable EPC tendering including cost and schedule estimates, as detailed in para II.2.1 herein.