2022-06-01Engineering,procurement,construction,installation and pre-commissioning activities for Above Ground Facilities... (IGI-Poseidon S.A.)
This notice concerns the EastMed Pipeline Project, designed to transport 11 bcm/y (11+1 bcm/y from the gas source till Cyprus where 1 bcm is left to satisfy local needs). The design and development consider all engineering and development activities, including related pre-investments, to allow a possible increase of capacity up to 20 bcm/y. EastMed Pipeline Project is currently in its FEED development phase.
The object of this notice are the above ground facilities and the O&M/Dispatching Centre as …
Δείτε την προμήθεια »
2022-06-01Engineering, procurement, construction, installation and pre-commissioning activities for Onshore Pipeline Sections... (IGI-Poseidon S.A.)
This notice concerns the EastMed Pipeline Project, designed to transport 11 bcm/y (11+1 bcm/y from the gas source till Cyprus where 1 bcm is left to satisfy local needs). The design and development consider all engineering and development activities, including related pre-investments, to allow a possible increase of capacity up to 20 bcm/y. EastMed Pipeline Project is currently in its FEED development phase.
The object of this notice are the onshore pipeline sections as described in section II.2.
Δείτε την προμήθεια »
2020-04-24Engineering, Procurement, Installation and Pre-commissioning Activities for Offshore Sections of EastMed Pipeline Project (IGI-Poseidon S.A.)
Detail engineering, procurement (including line pipes), fabrication and construction, transportation and installation, pre-commissioning (EPCI) of the offshore pipeline sections of the Eastern Mediterranean Pipeline Project (EastMed) which will allow transport of natural gas from the South Eastern Mediterranean basin to the European Natural Gas Network.
This notice concerns the first phase of EastMed designed to transport 10 bcm/y (11 bcm/y from the gas source till Cyprus where 1 bcm is left to satisfy …
Δείτε την προμήθεια »
2018-11-09Detailed Marine Survey of Offshore Pipeline for the EastMed Pipeline Project (IGI-Poseidon S.A.)
The survey services (Detailed Marine Survey) are required to supply the necessary high resolution route and geohazards survey data to support the completion of an engineering design program sufficient to support an EPC tender process for construction of the offshore segments of the East Med pipeline system.
The marine system comprises four submarine sections:
(i) source to Cyprus;
(ii) Cyprus to Crete;
(iii) Crete to (mainland) Greece;
(iv) Gulf of Patras crossing.
The interconnection of these four …
Δείτε την προμήθεια » Αναφερόμενοι προμηθευτές:Lighthouse S.p.A.
2018-07-02Engineering, Procurement, Installation and Pre-Commissioning activities for offshore pipeline (IGI-Poseidon S.A.)
Detail engineering, procurement, fabrication and construction, transportation and installation, pre-commissioning (EPCI) of offshore pipeline section between Greece and Italy, including shore approaches and short onshore pipeline sections at each landfall that terminate at the fence line of the onshore facilities (by others).
The governing code for the engineering, procurement and installation activities is DNVGL-ST-F101 (2017) for the subsea section and EN 1594 (2013) for the short onshore pipeline …
Δείτε την προμήθεια »
2016-10-19Reconnaissance Marine Survey for the EastMed Pipeline Project (IGI-Poseidon S.A.)
The EastMed Pipeline is a project of an offshore/onshore natural gas pipeline that will directly link the recently discovered off-shore gas reserves in the Levantine Basin (Cyprus and Israel) to the inlet point of the Poseidon Pipeline to transport the gas to Italy. The project, for its strategic relevance, is included in the Projects of Common Interest list at European level. The subject of this Contract Notice is to perform the marine surveys required to further confirm the feasibility of the offshore …
Δείτε την προμήθεια » Αναφερόμενοι προμηθευτές:Lighthouse S.p.A.
2011-12-06Manufacture, test and supply of centrifugal compressors for high pressure natural gas transportation inclusive of... (IGI-Poseidon S.A.)
Design, manufacture, supply transportation, installation, testing and commissioning of 4No. turbo-compressor packages each having gas turbine with an ISO power in the order of approximately 30 MW complete with the driven centrifugal compressor package and ancillary systems for high pressure natural gas pipeline transmission.
Compressors main characteristics are: approx. 380.000 Ncm/h flowrate, with suction pressure at 40 barg and discharge pressure at 140 barg.